Showing posts with label quilting. Show all posts
Showing posts with label quilting. Show all posts

Monday, January 9, 2012

{challenge} 12 WIP's in 2012 - completed quilt #1

My first quilt completed this year, and as part of AJ's challenge of 12 WIP's in 2012.



Generous Pram size (approx. 65cm x 85cm) - with all the fabrics used, found in my scraps tub. Completed with a simple stipple quilting, machine binded and finished with one of my new labels. This little quilt is for a friend of mine who has recently had baby #3, a little boy called Spencer.

Sunday, January 1, 2012

{challenge} 12 WIP's in 2012

AJ has set the challenge - can it be done?! 12 Quilting WIP's to be completed in 2012. The rules are 6 projects must be already underway and the other 6 in the pipeline. Well, I definitely have 6 project underway but not quite 6 in the pipeline but I am sure I will add to that list in the coming weeks as I add more projects to my to-do list.

So I pulled out my tubs of WIP's and found 7 quilting projects on the go that I hadn't completed. And yes I do say TUBS of WIP's as I have a few things half done, just started and almost there - and not just quilting projects ; )

The list - 7 projects underway;
1. Cot size girls jelly roll quilt - front pieced, just needs sandwiching, quilting, binding.
2. Cot size boys quilt - blocks need sashing, then sandwiching, quilting, binding.
3. Pram size girls jelly roll quilt - front pieced, just needs sandwiching, quilting, binding.
4. Pram size girls Japanese Patchwork Quilt - just needs sandwiching, quilting, binding.
5. Small Oh Cherry quilt - everything done, binding half on, just needs to be sewn down on the back.
6. & 7. 2 x Quilted nappy change wallets (one boys & one girls) - ready to be sandwiched and quilted.

The list - projects in the pipeline;
8. Red quilt for couch in theatre room - fabrics coming via our Fat Quarter Birthday Swap (so June for me).
9. Quilt for Nate's big boy bed he is moving into around April - pattern chosen, need to add some more fabrics to my stash I already have for this one.
10. Quilt for Tom's big boy bed he is already in - pattern chosen, need more fabrics.
11. Quilt for Couch in Lounge room - already have the fabrics, pattern not yet decided but might just make it a scrappy type quilt.
12. Pram Quilt for friend's new baby boy (who is already two weeks old so need to get cracking on this one!) - pattern chosen, need fabrics.

I'll add photos of the projects shortly when I decide which one to do each month, including which one I am going to tackle first this year (which I think needs to be number 12!).

Tuesday, December 13, 2011

{eb dolls quilt swap 2011} what I sent . . .

Yesterday Helen opened her package I sent her for the dolls quilt swap this year, and thankfully she loves it : )
I was really stuck as to what to make for Helen, as she is certainly an accomplished quilter and make some gorgeous quilts!
But I went with something different to challenge myself, tiny 1 inch squares and swirly quilting.
Its not perfect, but certainly very fresh and crisp and colourful!

Friday, December 2, 2011

{eb dolls quilt swap 2011} what I received . . .

A massive thankyou to Car for the stunning quilt she sent me for this years swap.
She seemed to know exactly what I would love.
Its perfect, very me.
And it will be a wonderful addition to my sewing room wall with the quilts from previous years swaps.
Thankyou Car x

Wednesday, November 30, 2011

EB Dolls Quilt Swap 2011 - Sneak Peak : )

Sneaking back into my blog, its been a while between posts, but I'm back and ready to blog again.

That stuff called time has been hard to come by these past few months, but I've done a little quilting these past few weeks in between the chaos of my little business that has grown these past 6 months in a way that I couldn't have imagined in such a short space of time, kinder runs and graduation day for Master T, dance classes for Miss M, the fast growing and into everything Master N and the dreaded housework, plus gardening, cubby house building, and of course markets markets markets! More on all this and more in coming blog posts!
A little spot of quilting has been achieved, I think the first time this year . . . and here's a peak, in the post tomorrow for the talented quilter that it is off too, I hope she loves it : )

Friday, January 21, 2011

My (a little late) Creative Space

A busy week here. Slowly getting myself geared up for another year of markets, with the first local one for the year in a couple of weeks time and the first city one - Lollipop Markets in Adelaide in 4 weeks time - eeeekkkk! So my rack of clothing had dwindle down to about a dozen dresses after the final Christmas markets so after a beautifully relaxing break away over the Christmas/New Year period I am back into full "sewing mode" and have been busy this week . . .
quilting

sewing

and an early release for Autumn/Winter 2011 available in store now.
More creative spaces over here : )

Tuesday, November 16, 2010

EB NQ Secret Santa - sneak peak . . .

A quick sneak peak of one part of the secret santa I have made for this years EB Newbie Quilters Secret Santa.I am in the process of making some changes to my blog, so please bear with me - trying to find a new template/design that I like.

Friday, November 5, 2010

EB DQS 2010 Opening Day - what I made : )

I know that my recipient has now received her quilt so I can show you what I made for Nicole. I had a lot of fun making this little quilt, and it was certainly hard to part with : ) I intend to make another one for my sewing room one of these days. It is the first time I have done a quilt completely done from applique, and the first time I have done quilting the way that I did it. I have no idea of the technical name of this type of quilting, and am sure I didn't do it technically right - but it was fun and I love the texture that it has created around the tree.



EB DQS 2010 Opening Day - what I received!

Today is opening day for the Annual EB Dolls Quilt Swap. My partner is yet to receive her parcel, it should be there today - grrr. . . . to Australia Post, why send something express when it doesn't arrive the next day like it is suppose to!?!?
Lucky us had our parcel arrive earlier in the week and with opening day today I was quick to open the parcel for Matilda - as I had requested a wall hanging for her room.
And haven't we been spoilt! This gorgeous quilt was made by Carmel - and we are in LOVE with the gorgeous detail and work she has put in to this little quilt.
Thankyou Carmel, we LOVE IT!

Friday, October 29, 2010

Blogtoberfest Day #29 ~ Quilting

I am attempting to finish off my dolls quilts for this years EB Dolls Quilt Swap. Post day is today, but I am running behind, luckily opening day isn't until the 5th November, so I still have time to get it in the post before then. I wanted to test myself out by trying a quilting technique I hadn't done before, so here is my first attempt
And a sneak at how I am going so far with the dolls quilt. About half way through so far, I am hoping to get the quilting finished tonight and then its just the label and binding to go.

Thursday, October 7, 2010

Blogtoberfest Day #7 ~ Quilting

Today I have been doing some quilting. Some basic blocks (not quite finished, a bit of applique to go on the ones that have a plain white centre) to make up a cot quilt. Recent markets have found me selling quite a few cot size quilts, so I have added to my list of stock to make for the upcoming Mathilda's Markets in Adelaide a couple of new cot quilts. You will find me there - Sunday 31st October at the Norwood Concert Hall, 9am to 1pm. Pop on down and say hello : )

Tuesday, October 5, 2010

Blogtoberfest Day #5 ~ DQS Sneak Peak

I finally made a start on my dolls quilt for this years EB Dolls Quilt Swap. I have LOTS to go!

Thursday, June 10, 2010

Its been a while . . .

since I last posted. Life is certainly hectic with 3 little bodies to keep entertained at home, but it's all good and I am still managing to fit in lots of sewing and quilting in between feeds, sleeps and nappy changes with little Nate, playing lego with Master T and drawing and crafting with Miss M.
A couple of new quilts finished . . .

Goodies received from some online bloggy quilting friends as part of our Birthday FQ swap we are doing this year. I requested reds/blues/whites to do a new quilt for Master T
Some new things for the markets - hair clip canvas's . . .
And a start on spring/summer sewing at the request of quite of few market customers recently . . .
I have also made a start on my Summer Collection, but no sneak peaks just yet : )

Wednesday, May 26, 2010

WIP Wednesday

Quilting is happening . . .

Quilting is done and ready to bind . . .

Fabric loveliness is arriving . . .

Market Prep is happening . . .

and this cheeky little man is distracting me with his dimples and smiles : )

Thursday, May 13, 2010

My Creative Space

Today I am back to some more quilting. I received an order of fabric from the Fat Quarter Shop in the post today - a layer cake of this new collection by Moda - Botany by Lauren & Jessi Jung. I love the earthy colours of this collection with the hints of pinks. So once I had the two littlest ones down for nap, I got cutting and put together this simple cot size quilt top.

This one I'll hopefully have finished for the next market in a couple of weeks time.

For some more lovely creative spaces go HERE : )

Quilting and Clippies

I am slowly getting myself into the groove of sewing, quilting and crafting again now that baby Nate is 5 weeks old - where are the weeks going. He is growing rapidly approaching the 5kg mark already, following us about, poking out his tongue an almost smiling : )
This week I have been making these cute little ribbon clippies that I thought might be a good extra for the markets as lots of customers also ask for clips rather than hair ties.
I also got some gorgeous fabrics in the post this week from Earthgirl Fabrics (I must say fabulous fast service!) - 6 fat quarters from Alexander Henry's Willow Collection. I love these gorgeous bright prints and have a couple of the fabrics ordered for Summer : ) I made this cot size quilt top yesterday from the fat quarters.
More sewing and crafting to be done over the coming weeks with 3 upcoming markets to get ready for : )

Thursday, March 25, 2010

My Creative Space

I'm quilting today. Some little pram quilts for the Easter Markets coming up that I have whipped up from some jelly rolls I had stashed away for a rainy day, not that its raining here, but I am still looking forward to the winter weather coming upon us and the days getting below 30 degrees!

The fabric is "Birdie" by Me & My Sister for Moda. Check out lots of other wonderful creative spaces today HERE : )

-----------------------------------------
Post updated with two little pram quilts; quilted, binded and finished : )

Thursday, February 4, 2010

Hushabye Quilts

I opened my "Hushabye" by Tula Pink jelly roll earlier this week and created two cot size (approx. 110x130cm) very quick quilt tops to finish and take to Mathilda's in Adelaide in March. The first I pieced together 24 random strips including all the pink ones from the roll then sliced in half, turned one half around and pieced the two long pieces together. The second one doesn't have any pink in it and I think the colours would be great for a little boy. This I have just left the strips as sewn - I had to add in 8 extra strips to get my 24 strips in total of some coffee coloured quilters cottons I picked up at spotlight. The spotted fabric I am using to back both quilts, not sure about the binding yet.

Girls quilt

Boys quilt - Miss M loves to 'help' measure everything with my measuring tape.

Apologies for the terrible photos once again - I am in serious need of a new camera, the colours really are much better in real life.

Now I just need to decide how to quilt these. I was first inspired to make these quick quilts like this after seeing the quilt Helen made for Ingrid's new little girl last year.

Sunday, January 31, 2010

Completed Quilt for Miss M

Finally its done! This is biggest quilt I have made so far (approx. 60 inch x 76 inch) for Miss M's new "big girl" king single bed. I finished off sewing the binding down tonight after having it sitting staring at me waiting for me to do this for quite a few weeks now. I FMQ'd the entire quilt standing up at my sewing machine as I found it impossible to manovere the weight of the quilt under the machine, especially with a pregnant belly in the way! If I decide to make another quilt this big in the future I think I will send it off to be done by someone with a professional quilting frame, much easier!
Completed top - with the 11 blocks plus my 1 block completed as part of the EB Newbie Quilters RR Block Swap we did over the last 6 months of 2009
Completed backing - 108 6inch squares. The strip up the entire right side is 2.5inch squares of fabric from everyones fabrics used in the swap. 36 2.5inch squares in total
Close up of the FMQ on the top - I went with a slightly larger spaced quilting than I usually do to get it done faster


Close up of the back


Miss M's new room. I have painted the feature wall, made the quilt, flags and curtains. And I need to order some prints for the walls and it will be finished. And then we just have to convince Miss M that yes she can sleep in here so the new bubba can sleep in her cot . . . she is not keen.

Apologies for the terrible photos - will try and get some better ones in the daylight tomorrow.

Yesterday's market went well, although could have been a little busier with prehaps a slightly younger crowd, but a good first one for the year.